Getting a Los Altos ADU permit will help you unleash your ADU’s full potential and boost the value of your property in the long run. Securing the necessary permits will go a long way in helping transform and enhance your living space according to your preferred specifications and city regulations.

Los Altos ADU Permit

As an ADU builder in Los Altos, we are here to guide you through every phase of the project, from site assessments to developing designs, obtaining permits, and building the unit.

 

Los Altos ADU Construction Regulations and Permitting Framework

The approval process for your Los Altos ADU permit is straightforward, and you would only need to apply for building, mechanical, electrical, and plumbing permits. Although other permits will be needed for the project, we will help you through these special cases.

The following are some of the regulations you should consider for your Los Altos ADU construction:

 

Zoning requirements When planning the construction of your Los Altos ADU, you must ensure that your property is zoned for residential use and has met the minimum lot size requirements set by the city.
Number of units Los Altos allows one ADU per lot, either attached or detached. This means that you can have either an attached ADU or a detached ADU on your property, but not both, depending on your specific needs and preference.
Parking You should have at least one off-street parking space near public transit when constructing your ADU.
Building  size If you plan to construct a detached ADU, it should be 1200 square feet.

For your attached ADU, the size should be half of the primary dwelling’s square footage but not over 1200 square feet.

Building height The height for your ADU maybe 16 feet high for a detached dwelling; for an attached one, the height should be the same as the primary building.
Owner occupancy There are no owner occupancy requirements for your Lot Altos ADU. However, if you plan to rent out your ADU, long-term agreements should exist.

 

Steps of Obtaining an ADU Permit in Los Altos

As a professional ADU contractor in Los Altos, we follow the following steps to obtain your ADU permit. However, these steps may vary depending on your specifications and the details needed for the project.

  • Planning: At Done Right Home Remodeling, we have full knowledge of the regulations provided by the city’s planning department and guarantee to have a plan for you that suits your specific needs and the feasibility of your property.
  • Design and Preparation: Our strategies and plans all comply with all the regulations and zoning requirements to ensure we give the best following your needs and those set by the city.
  • Permit Application: We prepare the permit application documents, including the application forms, construction plans, and other supporting documents required to ensure your specific needs are met.
  • Submission: This is the step where we will submit the permit application to the Los Altos planning department, which will ensure that your project meets the required regulations.
  • Permit Approval and Issuance: Once your ADU project has been reviewed and approved, you will receive a permit from the planning department. After they have been approved, we can now start your project following the regulations as professionals.
  • Construction and Inspections: At Done Right Home Remodeling, we pass our inspections at the various stages like the foundation, plumbing, electrical and final inspections at the end of the project.
  • Final Approval and Occupancy: Once the construction of your ADU is complete, we request a call for a final inspection from the building department, and once they have approved, you will receive a certificate of occupancy allowing you to occupy your ADU.
ADU Dining Room

Get Your ADU Construction Permits on Time

Our comprehensive Los Altos ADU construction service offers customized designs, incredible craftsmanship, and taking care of ADU construction permits. Make us the top choice for all your ADU needs.

 

FAQs

 

You must comply with the zoning regulations, adhere to building codes, submit construction plans, and pay the applicable fees.

The processing time for ADU permits can vary. Still, depending on the project’s complexity and the permitting department’s workload, it typically takes several weeks to a few months.

The city of Los Altos has parking requirements for ADUs. Generally, one off-street parking space is required for each ADU, but there may be exceptions or alternatives based on specific circumstances in your conversion.

The city of Los Altos has specific size limitations for ADUs. The applicable zoning regulations determine the maximum size and may vary based on the lot size and other factors.